Skip to content

Injectaclad Head Office Training


All Injectaclad QA Contractors undergo extensive training prior to being issued with an Installers Card to provide proof that individuals installing the Injectaclad system have sufficient skills and knowledge.

Injectaclad QA Contractor training is a vital component of the system and is separated into two sections.  The first, given by our technical director, covers the specifications, testing and areas of application including standard details which regularly occur during site installations.  The second part of the training is practical experience and is given by our operations director, covering the pump and installation practices, including live installations within our test beds.


fire sealant

fire resistant sealant

fire rated sealant


For more information on the Injectaclad cavity fire barrier remediation system,  or if you would like to speak with one of our team, please feel free to contact us.

 Contact Us

injectaclad

Keep Up To Date with the Latest News ...

Keep up to date with all the latest Injectaclad news and posts on our social networks.

Join on Linkedin

injectaclad, fire resistant sealant, cavity fire barrier, fire cavity barrier

Injectaclad is the world’s first remediation system for missing and/or defective cavity fire barriers to be retrospectively installed using a pumped system, alleviating the need for full scale façade removal.

By not removing the external façade coupled with the speed of installation, often undertaken via MEWPs rather than requiring full scaffolding, Injectaclad is a cost effective and non-invasive option to a significant problem on high rise buildings and other housing stock across the UK and further afield.

Contact Us


Skip to content